How Structural Drying Works and Why It Takes 3 to 5 Days

Your floor looks dry, so why is the equipment still running? Here is what structural drying actually does.

After water damage, many homeowners are surprised that drying equipment stays in place for several days. The floor looks dry within hours, so why is it still running?

Surface dry is not structurally dry

Water soaks into drywall, wood framing, subfloors and concrete. Those materials hold moisture long after the surface feels dry. If they are closed up too early, the trapped moisture can lead to mold, warping and odours weeks later.

How the process works

  1. Inspection and moisture mapping. Moisture meters show where water travelled, including inside walls and under flooring.
  2. Removing what can't be saved. Wet insulation, damaged drywall and soaked underlay are removed so the structure can dry.
  3. Air movers. These push air across wet surfaces so moisture evaporates faster.
  4. Dehumidifiers. These pull that moisture out of the air so it doesn't settle back into the materials.
  5. Daily monitoring. Readings are taken every day until materials reach normal dry levels.

Why it takes 3 to 5 days

Most homes reach dry standard in about three to five days, depending on how much water there was, what materials got wet, and the humidity in the home. Concrete and hardwood take longer. Turning equipment off early is one of the most common reasons water damage turns into a mold problem.